Federal Court of Australia
AUSTRALIAN COMPETITION TRIBUNAL
Applications by CitiPower Pty Ltd and Powercor Australia Ltd [2017] ACompT 4 Review from: Australian Energy Regulator Final Decision: CitiPower distribution determination 2016 to 2020 Australian Energy Regulator Final Decision: Powercor distribution determination 2016 to 2020
File numbers: ACT 4 of 2016 ACT 5 of 2016
Tribunal: ROBERTSON J (DEPUTY PRESIDENT) MR RF SHOGREN (MEMBER) DR DR ABRAHAM (MEMBER)
Date of Determination: 17 October 2017
Catchwords: ENERGY AND RESOURCES – applications under s 71B of the National Electricity Law for review of distribution determinations by the Australian Energy Regulator (AER) – whether reviewable error on the part of the AER – topics for review – adjusting base operating expenditure using an average of capitalised overheads for the three year period from 2012-2014 (corporate overheads expensing issue) –determining a labour price growth rate for 2016 based on the average of two forecasts of the rate of change in the wage price index for the Victorian electricity, gas, water and waste services (utilities) industry (labour price growth issue)
We try to embed the page this law was scraped from. If the site blocks framing, you still get the link and a local excerpt.
Last checked with source on —
Checking whether the official page can be embedded…
Plain-English simplify of this law: a short summary, key points, and both sides of the argument. Generated on first view via Replicate, then cached. Vote on what helps your study.
No study brief is cached for this law yet. Sign up to generate a plain-English brief.
Sign up to generate