Federal Register of Legislation
COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY SCHEDULE OF AIRWORTHINESS DIRECTIVES
Airbus Industrie A319, A320 and A321 Series Aeroplanes
AD/A320/51 Main Landing Gear Rear Pintle Pin 5/95
Applicability: A320 S/N 002 to 008, 010 to 014 and 016 to 021.
Requirement: Replace the rear pintle pin in the main landing gear in accordance with Airbus Industrie Service Bulletin A320-32-1024.
Note: DGAC AD 94-240-061(B) refers.
Compliance: Before 20000 landings or during the next main landing gear overhaul, whichever occurs first.
Background: Three cracked pins have been found on the fatigue specimen. To improve the fatigue performance, A320-100 pins are replaced by A320-200 pins on aircraft in service.
We try to embed the page this law was scraped from. If the site blocks framing, you still get the link and a local excerpt.
Last checked with source on —
Checking whether the official page can be embedded…
Plain-English simplify of this law: a short summary, key points, and both sides of the argument. Generated on first view via Replicate, then cached. Vote on what helps your study.
No study brief is cached for this law yet. Sign up to generate a plain-English brief.
Sign up to generate