Federal Register of Legislation
COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY SCHEDULE OF AIRWORTHINESS DIRECTIVES
Beechcraft 90 and 65-90 (King Air) Series Aeroplanes
AD/BEECH 90/41 Cabin Heater Modification and Aft Fuselage Drainage and Sealing - Modification
Applicability: Models 65-90, 65-A90 & B90 with S/Nos. LJ-1 to LJ-484. Requirement: 1. Install a temporary placard on the heater control panel stating: "IF HEATER FAILS TO HEAT, TURN OFF IMMEDIATELY"
2/76
2. Modify cabin heater installation, including the fitment of a cabin heater out light, in accordance with Beechcraft SI No. 0230-412, Revision 3.
3. Modify the aft fuselage in accordance with Beechcraft SI No. 0268-103, Rev. 1. Compliance: For Para. 1 - Within 50 hours' time in service after 27 Feb. 1976. For Para. 2 - Before 1 January 1977.
For Para. 3 - Within 100 hours' time in service after 27 Feb. 1976.
Note: Temporary placard, para. 1, may be removed when para. 2 is accomplished.
We try to embed the page this law was scraped from. If the site blocks framing, you still get the link and a local excerpt.
Last checked with source on —
Checking whether the official page can be embedded…
Plain-English simplify of this law: a short summary, key points, and both sides of the argument. Generated on first view via Replicate, then cached. Vote on what helps your study.
No study brief is cached for this law yet. Sign up to generate a plain-English brief.
Sign up to generate