Select any passage to save a personal note with optional tags.
COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY
SCHEDULE OF AIRWORTHINESS DIRECTIVES
Piper PA-44 (Seminole) Series Aeroplanes
AD/PA-44/11
Amdt 1
Ammeter Installation 12/86
Applicability: Model PA-44-180T with S/Nos 44-8107001 through 44-8207020.
Requirement: Action in accordance with Piper Service Bulletin No. 847. Ensure the shunt is positioned and adequately supported to prevent mechanical loads being applied to the 20 gauge wires connected to the ammeter.
Compliance: Within 100 hours time in service after 31 December 1986.
Background: Reports have been received of loose and/or shorting ammeter connections at the ammeter cluster gauge. If this condition is allowed to continue without rectification the possibility exists for electrical failure or fire within the cockpit. Amendment 1 clarifies the protection requirement.
Related laws
No related documents linked yet.
You've got 21 of 22 free Acts left this visit. Sign up anytime for Facts, Related, and study briefs too.