Federal Register of Legislation
COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 106 CIVIL AVIATION SAFETY AUTHORITY SCHEDULE OF AIRWORTHINESS DIRECTIVES
Pratt and Whitney Piston Engines
AD/PW-P/15 Crankshaft Flyweight and Flyweight NK
Liners - Inspection and Modification
Applicability: R985 series.
Document: Pratt & Whitney SB 1758 Rev. A.
Compliance: Installed Engines - Before installation in an aircraft following each overhaul. Spare engines - Before installation in an aircraft after 2 November 1967 unless previously inspected and reworked or replaced as necessary in accordance with Pratt & Whitney SB No. 1758 or P&W Wasp Junior Overhaul Manual P/N 123440 at last overhaul.
We try to embed the page this law was scraped from. If the site blocks framing, you still get the link and a local excerpt.
Last checked with source on —
Checking whether the official page can be embedded…
Plain-English simplify of this law: a short summary, key points, and both sides of the argument. Generated on first view via Replicate, then cached. Vote on what helps your study.
No study brief is cached for this law yet. Sign up to generate a plain-English brief.
Sign up to generate