AD/CF6/18 - High Pressure Turbine Inspection and Improved Shroud Cooling (Cth)
Federal Register of Legislation
Full text
Select any passage to save a personal note with optional tags.
COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 106 CIVIL AVIATION SAFETY AUTHORITY
SCHEDULE OF AIRWORTHINESS DIRECTIVES
General Electric Turbine Engines - CF6 Series
AD/CF6/18 High Pressure Turbine Inspection and Improved Shroud Cooling
Applicability: All model CF6-80C2, A5, B6, B6 F and DIF.
Requirement: Carry out the technical requirements of FAA AD 91-05-21 Amdt 39-6900.
6/91
Compliance: As detailed in Requirement Document with a revised effective date of 13 June 1991.
Background: The AD introduces a borescope inspection program to detect high pressure turbine (HPT) stage 1 shroud and blade distress. Also, it requires installation of improved HPT hardware which increases the cooling to the HPT stage 1 shroud. The AD is prompted by one HPT failure which resulted in aircraft damage.