Federal Register of Legislation
COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY SCHEDULE OF AIRWORTHINESS DIRECTIVES
Douglas DC3 Series Aeroplanes
AD/DC3/28 Reissue
Applicability: All models.
Hydraulic System - Modification 1/84
Document: Douglas SB No 239.
Compliance: Unless already accomplished within 100 hours time in service after 31 May 1984.
Background: This Directive is reissued with no changes to the requirement. In the event of an engine failure during the take-off phase, this modification ensures the availability of hydraulic pressure to raise the undercarriage if required.
We try to embed the page this law was scraped from. If the site blocks framing, you still get the link and a local excerpt.
Last checked with source on —
Checking whether the official page can be embedded…
Plain-English simplify of this law: a short summary, key points, and both sides of the argument. Generated on first view via Replicate, then cached. Vote on what helps your study.
No study brief is cached for this law yet. Sign up to generate a plain-English brief.
Sign up to generate