Federal Register of Legislation
COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY SCHEDULE OF AIRWORTHINESS DIRECTIVES
Embraer EMB-110 (Bandeirante) Series Aeroplanes
AD/EMB-110/42 Undercarriage Wiring Inspection 13/89
Applicability: All model EMB-110 aircraft.
Requirement: Carry out an inspection of the main and nose landing gear wiring in accordance with Embraer SB 110-32-052R3.
Note: Brazilian AD 82-10-02R1 refers.
Compliance: Unless previously accomplished,
1. Within 25 hours time in service from 28 December 1989, and
2. Thereafter at intervals not exceeding 600 hours time in service or 3 months.
Background: Embraer have advised that the main and nose landing gear wiring are subject to wear in operation which can produce open and/or short circuits which may result in erratic indication and/or uncommanded operation of the landing gear.
We try to embed the page this law was scraped from. If the site blocks framing, you still get the link and a local excerpt.
Last checked with source on —
Checking whether the official page can be embedded…
Plain-English simplify of this law: a short summary, key points, and both sides of the argument. Generated on first view via Replicate, then cached. Vote on what helps your study.
No study brief is cached for this law yet. Sign up to generate a plain-English brief.
Sign up to generate