Federal Register of Legislation
COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY SCHEDULE OF AIRWORTHINESS DIRECTIVES
British Aerospace BAe 125 Series Aeroplanes
AD/HS 125/143 Amdt 1
Addition of Vents and Pressure Relief Device 11/94
Applicability: Model BAe 125 Series 1000A and 1000B and Hawker 1000.
Requirement: 1. Action in accordance with Hawker Raytheon Corporate Jets Mandatory Service Bulletin 53-76-3627A.
2. Action in accordance with Hawker Raytheon Corporate Jets Mandatory Service Bulletin 53-81-3661B.
3. Action in accordance with Hawker Raytheon Corporate Jets Mandatory Service Bulletin 21-151-25A683C.
Compliance: Prior to 31 March 1995.
Background: The manufacturer and the UK CAA require certain actions to be taken to ensure the structural integrity of the aircraft, in the event of an explosive decompression. Amendment 1 is issued in response to an additional modification requirement which has taken the manufacturer time to develop. As this modification requires minimal removal of furnishings for access, the UK CAA has imposed the same compliance time.
We try to embed the page this law was scraped from. If the site blocks framing, you still get the link and a local excerpt.
Last checked with source on —
Checking whether the official page can be embedded…
Plain-English simplify of this law: a short summary, key points, and both sides of the argument. Generated on first view via Replicate, then cached. Vote on what helps your study.
No study brief is cached for this law yet. Sign up to generate a plain-English brief.
Sign up to generate