AD/ML-M4/7 - Aileron Control System - Modification (Cth)
Federal Register of Legislation
Full text
Select any passage to save a personal note with optional tags.
COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY
SCHEDULE OF AIRWORTHINESS DIRECTIVES
Maule M-4 Series Aeroplanes
AD/ML-M4/7 Aileron Control System - Modification 10/69
Applicability: All models.
Requriement: Remove the bolt attaching the most forward aileron control system pulley to the control column.
Replace the pulley assembly with the addition of washers AN970-5 and AN960-516, and bolt AN5-27 instead of the original bolt in the following order from front to rear:
1. AN5-27 Bolt - head forward.
2. AN970-5 Washer
3. AN960-516 Washer
4. Original Pulley
5. Control Column
6. AN960-516 Washer 7. AN365-524 Nut.
Compliance: Within 25 hours time in service after 1 October 1969.