Federal Register of Legislation
Water Act (Northern Basin Review and Other Measures) Direction 2018
I, DAVID LITTLEPROUD, Minister for Agriculture and Water Resources, make the following direction.
Dated 28 June 2018
DAVID LITTLEPROUD Minister for Agriculture and Water Resources
Contents 1 Name...................................................1 2 Commencement............................................1 3 Authority................................................1 4 Definitions...............................................1 5 Direction.................................................1
1 Name This instrument is the Water Act (Northern Basin Review and Other Measures) Direction 2018.
2 Commencement This instrument commences on the day after it is registered on the Federal Register of Legislation.
3 Authority This instrument is made under section 49AA of the Act.
4 Definitions Note: A number of expressions used in this instrument are defined in section 4 of the Act, including the following: (a) Authority; (b) Basin Plan. In this instrument: Act means the Water Act 2007.
5 Direction (1) The Authority must prepare an amendment of the Basin Plan that is the same in effect as the Basin Plan Amendment Instrument 2017 (No.1). Note: The Basin Plan Amendment Instrument 2017 (No.1) was disallowed by the Senate on 14 February 2018. (2) The amendment must include the changes set out in paragraphs 2(2)(a), (b) and (c) of Schedule 10 to the Act.
We try to embed the page this law was scraped from. If the site blocks framing, you still get the link and a local excerpt.
Last checked with source on —
Checking whether the official page can be embedded…
Plain-English simplify of this law: a short summary, key points, and both sides of the argument. Generated on first view via Replicate, then cached. Vote on what helps your study.
No study brief is cached for this law yet. Sign up to generate a plain-English brief.
Sign up to generate