CLIFT v WINDRUM
SUPREME COURT OF NEW SOUTH WALES COURT OF APPEAL
MAHONEY, CLARKE and MEAGHER JJA
20 August 1991, 2 September 1991
[1991] NSWCA 54
APPEAL from Equity Division — Injunctions — Interlocutory orders — Claim for
compensation for damage suffered by third party as the result of an interlocutory
injunction — Power of court to refuse application for compensation because of
conduct of applicant — Considerations to be taken into account. LEAVE TO
APPEAL — Grant of leave nunc pro tunc.
Mahoney JA The plaintiffs Messrs George, Ronald and Peter Clift sought an
enquiry as to the damages suffered by them as the result of an interlocutory
injunction granted in proceedings between Dr Graham Melrose Windrum and
Rejilo Pty Limited. Their application was refused. They have appealed to this
Court against that refusal.
The plaintiffs were not parties to the proceeding between Dr Windrum and
Rejilo. Their claim was that they fell within the words "any person... affected by
the operation of the interlocutory order or undertaking..." within the undertaking
given in the proceeding by Dr Windrum. It was accepted that this was so.
In any application for compensation under such an undertaking, it may be
convenient for the court to deal with the claim in two stages: first, to consider
whether an entitlement to compensation has been shown; and, second, to provide
for the assessment of the appropriate compensation to be paid. The present was,
I think, such a case. The learned judge did not proceed to the assessment stage:
he refused to order a reference of the application to the Master for that purpose.
The matter to be determined on this appeal is primarily whether the learned judge
was right in so doing.
The learned judge's decision was, in one sense, discretionary. It was necessary
for him, having determined the facts in dispute, to weigh the considerations to be
taken into account when determining whether the plaintiffs had an entitlement to
compensation. Mr Graham QC, for the defendant Dr Windrum, submitted that,
for the plaintiffs to succeed, they must show that the learned judge's discretion
miscarried, within the principles established for this purpose: see Gronow v
Gronow (1979) 144 CLR 513; Norbis v Norbis (1986) 161 CLR 513. Mr
Rayment QC, for the plaintiffs, submitted that his Honour had erred in that he had
misunderstood the principles involved and that he had acted upon wrong findings
of fact. In order to consider the submissions made for the plaintiffs, upon this
basis and upon other bases advanced in the appeal, it is necessary to refer to the
circumstances of the undertaking and the application. The learned judge dealt
with this by reference, in part, to the judgment of Hodgson J in the original
proceeding. It is not necessary for present purposes to state all of the relevant
facts: I shall state summarily the facts directly relevant to the submissions which
have been made.
2 UNREPORTED JUDGMENTS
The plaintiffs, as a partnership, had for many years carried on businesses in the
grazing and pastoral area. They formed the company Rejilo Pty Ltd as the
"vehicle" to buy the grazing property here in question, "Kiaka" near Dungog.
The plaintiffs were, at all times here relevant, the only directors of that company.
On 25 September 1987, the company contracted to sell the property to DR and
JA Holdings Pty Limited and, by an associated agreement, the plaintiffs entered
into arrangements with that company in respect of livestock on the property.
On and before 25 September 1987 Rejilo Pty Ltd had been in negotiation with
Dr Windrum to sell the land to him. A draft contract had been prepared which,
in its terms, referred to livestock of particular kinds. Dr Windrum claimed that the
company had made a binding contract to sell the land to him. The company
denied this and proposed to complete its contract with DK and JA Holdings Pty
Limited.
On 30 September 1987 Dr Windrum commenced proceedings against the
company for specific performance of the contract he alleged. He sought an
interlocutory injunction against the company to restrain it completing the
contract it had propounded and on 2 October 1987, upon the basis of a
conventional undertaking as to damages, an interlocutory injunction was given.
That or consequential restraints continued during the course of the proceeding.
On 29 July 1988 Hodgson J held that no contract had been made with Dr
Windrum and dismissed his proceeding against the company. On 18 August
1988, at the request of the company, his Honour directed an inquiry by a Master
as to the damages suffered by the company by reason of the interlocutory relief
which had been given. Appeal proceedings by Dr Windrum to this Court and to
the High Court of Australia were unsuccessful: on 14 October 1988, Dr
Windrum's application for special leave to appeal to the High Court of Australia
was dismissed.
The proceedings before the Master in respect of Dr Windrum's undertaking as
to damages resulted, on 31 October 1989, in judgment being entered by consent
for the company for $32,000. On the same day, the plaintiffs, by motion in the
proceeding moved for orders that they be made defendants in the proceeding and
that the court direct an inquiry by a Master as to the damages suffered by them
as the result of such interlocutory restraints. On 3 April 1991 Needham J refused
such orders and dismissed the motion.
The plaintiffs' appeal against the order of Needham J was brought to this Court
without leave. On the hearing of the appeal the question arose as to whether leave
to appeal was necessary: see Supreme Court Act 1970, s101(2).
Leave to appeal is necessary where the order appealed from is an interlocutory
order or a judge of the court: s101(2)(c). It is not necessary for present purposes
to examine the nature of an interlocutory order for this purposes. It is sufficient
to say that, in accordance with the principles now established by the High Court
of Australia, an order is interlocutory if it does not "finally determine the rights
of parties": see Carr v Finance Corporation of Australia Ltd (No 1) (1981) 147
CLR 246 at 248. This principle leaves for determination what, in the particular
case, are "the rights of the parties". It was the contention of Mr Rayment QC, for
the plaintiffs, that the plaintiffs were not parties to the original proceeding, that
their dispute with Dr Windrum was the separate and distinct dispute as to
compensation to which I have referred, and that that their rights in respect of that
matter were finally determined against them by his Honour's dismissal of their
motion.
URJ CLIFT v WINDRUM (Mahoney JA) 3
It is not necessary for present purposes that this Court form a concluded view
upon these submissions. It has been the long standing practice of this Court,
where there is doubt whether leave to appeal is necessary in such a context and
where the court is of the view that, if leave be necessary, it should be granted, for
the court to order that, if and insofar as leave be necessary, it be granted. In the
present case, it is proper that the court order that, nunc pro tunc, leave to appeal
be granted and that the appeal proceed accordingly.
The argument on the appeal has proceeded on the basis that the undertaking for
damages given by Dr Windrum was generally in the form of "the usual
undertaking", with appropriate amendments to meet the instant case: see Pt28
17(2), where the form of "the usual undertaking as to damages" is set forth. The
undertaking was extended from time to time. Nothing has been urged to turn
upon the precise form of the undertaking and the appeal may be dealt with on that
basis.
Needham J refused to order the inquiry for damages sought essentially for two
inter-related reasons: because of the delay by the plaintiffs in seeking
compensation; and because of the circumstances of the judgment given for
damages in favour of Rejilo Pty Ltd. These two matters are, as the learned judge's
judgment indicated, inter-related but it will be convenient to deal with them, at
least initially, separately.
1. Delay:
The principles upon which entitlement to and assessment of compensation
pursuant to such an undertaking are to be determined have been considered in
detail by the High Court of Australia in Air Express Ltd v Ansett Transport
Industries (Operations) Pty Ltd 146 CLR 249. The members of the court there
referred to the established decisions in this regard: see, eg, Smith v Day (1882)
21 ChD 421; Griffith v Blake (1884) 27 ChD 474 and Victorian Onion and Potato
Growers' Association v Finnigan (1922) VLR 819. The views of their Honours
in relation to these matters were not, I think, in all respects congruent but, except
to the extent to which I shall refer, it is not necessary for present purposes to
detail and compare them.
It has not been in contest but that delay in bringing an application for damages
consequent upon such an undertaking is a matter relevant to be taken into account
in determining a party's entitlement. The objection that was made for the
plaintiffs was that his Honour erred in the manner in which he took that factor
into account. It was submitted that - I put the matter generally - he took into
account delay as such rather than "all the circumstances of the case". Mr
Rayment QC submitted that the reference Cussen J to "all the circumstances of
the case" in Victorian Onion and Potato Growers' Association v Finnigan should
be taken as establishing the relevant principle.
I do not think that the learned judge erred in what he did in this regard. His
Honour said:
"The question is whether, in the circumstances of this case, an order should be
made directing an enquiry as to the damages suffered by the applicants by virtue
of the delays caused by the interlocutory orders."
Having referred to some of the authorities, his Honour said: "The two
principles which have emerged from the cases tending against the right to claim
damages in these circumstances are: (a) delay, (2) the existence of 'special
circumstances': Graham v Campbell 7 ChD 490 at 494, or lack of fairness and
reasonableness (Aickin J) or conduct of the defendant making it inequitable for
such an order to be made (Gibbs J).
4 UNREPORTED JUDGMENTS
The plaintiff relies on both of these principles. The notice of motion was filed
just over a year after Hodgson J's judgment, and that delay is unexplained."
(The reference to Aickin J and to Gibbs J was a reference to what had been said
by them in the Air Express case).
The plaintiffs submitted that his Honour's conclusion that the delay was
"unexplained" was wrong. Reference was made to the events which took place
and the way in which the claim by Rejilo Pty Ltd had been processed. These
facts, the suggestion was, explained what had happened. But, in my opinion,
what the learned judge meant was that there was no acceptable explanation as to
why, if the plaintiffs were to make a claim, their claim was not made at or about
the time of the company's claim. It may be suggested that the plaintiffs' claim
was not brought earlier because of error or for some other reason. But the learned
judge, in my opinion correctly, concluded that in the circumstances no
satisfactory explanation was offered to the court for leaving the plaintiffs' claim
until the point at which the company's claim had been determined. Properly
understood, I do not think that what the learned judge did in this respect was
wrong.
2. The judgment for Rejilo Pty Ltd:
Needham J, in what he did in taking into account the judgment obtained by the
company and the circumstances of it, took the view that there was, to an extent,
a discretion in the court as to whether an undertaking should be enforced and he
saw this matter as relevant in that regard. He saw the delay as being one of the
"other factors" showing "that the grant of the order sought would be
unreasonable, unfair or inequitable".
His Honour said:
"The applicants, as I have set out, are directors of the first defendant, and must
be taken to be fully aware of the facts of the case. Throughout the preparation of
the first defendant's case for damages, the applicants were parties to the first
defendant's claim for damages suffered by it and by them. Whenever the first
defendant's claims were particularised, they included claims for damages which
were clearly damages suffered by the applicants. On more than one occasion, the
plaintiff's solicitors drew attention to this fact, which then became quite apparent
to the applicants, if they had been ignorant of it. On one occasion they responded
by saying that it had been intended that the first defendant would buy the cattle
from the applicants to meet its obligations under the proposed contract. The
combined claim was continued to be pressed right up to 18 October 1989.
The plaintiff made an offer to compromise this claim. He could not have been
contemplating making an offer to settle any claim other than that which was
being pursued by the first defendant. This fact must have been known to the
applicants. After the offer had been made and received by the first defendant, and
after discussions between counsel had raised the question, once more, of the
respective entitlements of the first defendant and the applicants, counsel for the
first defendant told counsel for the plaintiff that he, the latter, 'may well be right'
and that 'what we probably propose to do is get an adjournment and to apply to
Hodgson J for an order that an inquiry be had as to the damage suffered by the
Clifts'.
No such application was made on 19 October, but the first defendant, on the
morning of the hearing, served notice of acceptance of the offer and the notice of
motion. The offer could not have been withdrawn by the plaintiff for 28 days,
URJ CLIFT v WINDRUM (Mahoney JA) 5
unless the court ordered otherwise. The obligation of the first defendant, in my
opinion, if it wanted to separate the claims of itself and the applicants, was to
reject the offer, not to accept it.
At the hearing of the motion, the applicants sought to revert to the position
which prevailed before the first defendant accepted the offer. They offered to
consent to the judgment being set aside as a condition of being allowed to make
their claim. It was said that the plaintiff would suffer no prejudice, as any order
in favour of the applicants for interest could be tailored to meet the altered
circumstances.
What is being proposed, in effect, is that both the first defendant and the
applicants should be permitted to claim damages against the plaintiff. The
plaintiff would be put to further expense and delay in defending both claims. I do
not think it is fair, reasonable or equitable to allow the applicants what is really
a second attempt, they having belatedly realised that their first attempt was based
on a false premise. As I have said, there is no explanation for the initial delay and
that factor must also be taken into account.
In my opinion, the motion should be dismissed with costs."
In the Air Express case, Gibbs J: at 311-2; said:
"The insistence upon the giving of an undertaking is a very important, if not
an essential, means of preventing injustice from being done by the court when it
makes an order at an interlocutory stage, before the rights of the parties have been
finally determined. The court has a discretion not to enforce such an undertaking,
but unless the defendant has been guilty of conduct that would render it
inequitable to enforce the undertaking it would seem just, speaking generally, that
a plaintiff who has failed on the merits should recompense the defendant for the
damage that he has suffered as the result of the making of the interlocutory
order."
Stephen J: at 319: said:
"Damages awarded under such an undertaking are, therefore, of a rather
different nature from those awarded at common law. This special character
appears from the fact that their source lies in the plaintiff's own voluntary
undertaking, given as the price of obtaining an injunction. It may also be seen in
the words of the common form of the undertaking, that they must not only be
sustained by reason of the grant of an injunction but the court must form the
opinion that the plaintiff 'ought to pay' them. It was in the context of such an
undertaking that, in Finnigan's case, Cussen J said (32):
'I think the terms of the undertaking are themselves of importance. It provides
that there may be an order as to damages if the court shall be of opinion that the
defendant has sustained any. I think the word 'damages' in that undertaking is to
be given a very general meaning, and is not necessarily to be given the same
meaning as the word 'damages' when used in connection with breaches of
contracts. 'Damages' in this case seems to me to mean real harm, rather than to
have any strictly defined meaning.'"
Mason J, in a dissenting judgment: at 323; said:
"There are statements which indicate that the court has a discretion to decide
whether it shall order an inquiry for damages for breach of an undertaking given
to the court: see Smith v Day (1882) 21 ChD 421 at 425, 427. But the discretion
is to be exercised according to well settled principle. Generally speaking, so long
as the claim for damages is not trivial or trifling an inquiry should be directed and
the defendant will be entitled to recover the loss which is the natural consequence
of the grant of the injunction. The Supreme Court of Canada has held that the
6 UNREPORTED JUDGMENTS
court will be entitled to refuse a reference as to damages where there are special
circumstances, ie, when the plaintiff is a public body and acts in the public
interest to hold the situation until the rights are determined or when the
defendant, having succeeded on technical grounds, has been guilty of
misconduct: Vieweaer Construction Co Ltd v Rush and Tompkin's Construction
Ltd (1964) 48 DLR (2d) 509 at 519. It has not been suggested that there are any
special circumstances in the present case."
Needham J, in my opinion correctly, addressed himself to the question whether
what happened in respect of the judgment for Rejilo Pty Ltd and the context of
the claim generally warranted the discretionary refusal of the plaintiffs' claim that
there should be an assessment of their damages. The question therefore to be
determined is whether his Honour rightly determined the nature of what had
happened and whether there were in what had happened circumstances justifying
such a refusal.
The circumstances in which the company's claim was made, pursued and
compromised are not uncomplicated. I shall refer to an outline of them sufficient
to indicate the matters to which, in this regard, the learned judge had reference.
On 18 August 1988 Hodgson J referred to a Master the claim made by the
company. As far as appears, relevant correspondence in relation to the claim
between the solicitors commenced on 15 December 1988 and, on 15 March 1989,
the company's claim was particularised. The particulars showed that, in general
terms, the claim was based upon two things: the loss of the use of the moneys that
would have been received as the price of the land and the cattle, and the expenses
incurred in the running of the property pending the determination of Dr
Windrum's claim for specific performance. The total amount then claimed was
$282,269.25.
Correspondence then ensued in which, inter alia, Dr Windrum's solicitors
raised questions as to whether particular sums which were itemised could be
claimed and the basis of the claim for them; reference was also made to whether
the company owned cattle in respect of which a claim was being made and to
other matters going to the company's entitlement. A number of documents were
produced to substantiate the company's claim.
The hearing of the claim before the Master was fixed for a date in October
1989. It appears to be agreed that on 17 October 1989, Mr Graham QC spoke to
Mr Officer QC, then senior counsel for the company, and the following
conversation took place:
"MR GRAHAM: I assume your application is intended to cover all damages
suffered by your client as a result of my fellow's undertakings. The order for
inquiry as to damages made by Hodgson J only relates to the period up to 18
August 1988. It will be necessary to obtain an order from the court tomorrow
extending the inquiry up to the date the High Court refused the leave application.
Do you agree with that?
MR OFFICER: Yes, we want to cover all damages - I agree that we should
have a consent order extending the inquiry but it would have to go a bit beyond
the leave application as although the injunction was only a restraint 'on
completion' from 18 November 1987 the matter could not have been completed
on the day the High Court refused leave to appeal. Rejilo's entitlement to
damages must extend up to the date on which completion actually takes place."
On 18 October 1989, Dr Windrum forwarded to the company a formal offer of
compromise for $32,000. Later on the same day, at approximately 4.45 pm, final
details of the claim made by the company were sent by the company's counsel
URJ CLIFT v WINDRUM (Mahoney JA) 7
to Dr Windrum's counsel. These details showed a claim for "interest on" the sale
price of the land and the "price of cattle" over particular periods, together with
a claim for "Kiaka Station expenses". They totalled $271,086.03 plus "interest at
Supreme Court rates from 21.11.88 to 19.10.89 at 15%... $37,274.33". The total
was therefore $308,360.36.
On 19 October 1989 at approximately 11 am, a formal acceptance of Dr
Windrum's offer of compromise was delivered by the company. On the same day,
the company filed a notice of motion seeking the relief now in question.
On 19 October 1989 the company's claim was mentioned before Master
Windeyer and orders were made in accordance with the acceptance of Dr
Windrum's offer. The court then noted that "the aforesaid judgment is made upon
the acceptance on 19 October 1989 of an offer of compromise made on 18
October 1989 pursuant to Pt22 of the Supreme Court Rules".
It was in respect of these matters that Needham J made the observations to
which I have referred. It was submitted for the company that it was open to Dr
Windrum, on learning of the filing of the claim by Messrs Clift, to have applied
to the court for an order under Pt22 that the acceptance of the compromise be not
effective: the submission was that an offer could, in the circumstances of this
case, have been deemed withdrawn notwithstanding that it had previously been
accepted. And the company, before Needham J and before this Court, offered to
set aside the agreement.
It is not necessary for present purposes to pursue the question whether it would
then have been open to Dr Windrum to have withdrawn from the agreement made
with the company. Reference was made to, as it was suggested, the principle that
the court has a particular control over agreements made by way of compromise
of pending litigation: see Neale v Gordon Lennox (1902) AC 465 and Waitemata
City Council v Mackenzie (1988) 2 NZLR 242. Counsel referred to the
unreported judgment of Finlay J in TJ Lewis v Combell Constructions Pty Ltd,
29 November 1989.
Evidence was given at the trial to suggest that, in making the agreement, those
advising Dr Windrum had acted upon the basis that the amount to be paid to the
company was the total of what was claimable under the undertaking, at least by
the company and those associated with it. The learned judge held that such
evidence was not admissible and no appeal has been pressed against his Honour's
ruling. There was no evidence before this Court to indicate whether the amount
of $32,000 agreed to be paid represented a calculation of what was, on strict
analysis, claimable only by the company and did not include (or was not
calculated by reference to) amounts claimed by the company but which might
properly be claimed by the present plaintiffs.
However, Mr Graham QC has suggested in argument that it is clear that the
two claims (that of the company and that of the Messrs Clift) substantially
overlapped. He suggested, for example, that the documentation produced to
support the company's claim for the working expenses of the land while the
interlocutory restraints were in force showed that the amounts claimed by the
company in that regard were substantially identical with the amounts now
claimed by the present plaintiffs. And he referred to the fact that, during the
negotiations concerning the company's claim, reference was made to the fact that
some of the amounts claimed were or might properly be damages suffered not by
the company but by the present plaintiffs.
8 UNREPORTED JUDGMENTS
It was not argued by Mr Graham QC that the compromise of the company's
claim was a legal bar to the claim by the plaintiffs. It is proper to proceed on that
basis. But, the submissions suggested, the fact that the plaintiffs' claim was made
only when it was was a matter which could and should weigh heavily against the
allowance of it.
In this regard, the absence of any satisfactory explanation from the plaintiffs as
to why their claim was not made earlier is, in my opinion, of significance. If it
were established that what the plaintiffs did was to allow Dr Windrum to settle
a claim which contained amounts proper to be claimed both by the company and
the present plaintiffs, with the intent that subsequently a claim covering some at
least of the items in question would be made by the plaintiffs, that would, in my
opinion, be a proper ground to be taken into account in the refusal of the
plaintiff's claim. So to hold is not, I think, contrary to the principles established
or recognised in the Air Express case.
Mason J described an injured party's right to claim compensation in terms less
conditional than did Gibbs J or Stephen J. But I would respectfully not
understand what Nason J said as holding that, if that party asked in a fashion
unacceptable in Equity, he was yet entitled to require that his loss be assessed and
paid. The undertaking is given to the court and it is given in the context of the
grant of equitable relief. The court would have the power, in my opinion, to
refuse to allow a party who has acted in an unacceptable manner to obtain one
agreement to make a further claim whilst maintaining in force an agreement of
the nature of the original agreement here in question. Nor, I think, would it allow
such a party, when the circumstances of the first agreement were objected to, to
set aside the first agreement so that it might then proceed with each claim
separately.
There was in this case no detailed examination of why the plaintiffs did not
pursue their claim until after compromise of the company's claim. But as his
Honour pointed out, they were directors of the company, and it is proper to infer
that they knew of the company's claim and of the basis on which it was pursued.
If they allowed that claim to be pursued deliberately, knowing that they would
subsequently pursue a claim of their own, that in my opinion would be conduct
justifying a refusal to allow them to pursue their own claim in addition. If they
had done what they did by accident and because of a failure initially to appreciate
they might separately have a claim, different considerations might arise. But, as
his Honour indicated, no attempt was made by the plaintiffs to deal with that
aspect of the matter.
These matters were open in the proceedings before Needham J and, if the
plaintiffs had had an acceptable explanation for what had occurred, it was to be
expected that they would advance it. I do not mean by this that they were obliged
in law to do so. But, in the absence of an explanation of the position, I do not
think that his Honour was wrong in coming to the conclusion he did.
It was not suggested before this Court that Dr Windrum, in accepting the
agreement made by the plaintiffs' acceptance of his offer, acted improperly for
the purpose of excluding a possible claim by the plaintiffs or otherwise. His
conduct was, in the circumstances, not the subject of attack.
In my opinion, therefore, the plaintiffs' appeal should be dismissed with costs.
Clarke JA I agree with the judgment of Mahoney JA.
Meagher JA I agree with Mahoney JA.
Appeal dismissed with costs.
URJ CLIFT v WINDRUM (Meagher JA)
Counsel for the Appellant: BW RAYMENT QC/P BIGGINS
Counsel for the Respondent: PR GRAHAM QC/R R I HARPER
Solicitors for the Appellant: WALKER BEER and ASSOCIATES
Solicitors for the Respondent: SLY and WEIGALL