Medium Neutral Citation: Colvin v Eather [2016] NSWDC 29 Hearing dates: 21 March 2015 Date of orders: 21 March 2016 Decision date: 21 March 2016 Jurisdiction: Civil Before: Judge Levy SC Decision: 1. Verdict and judgment for the plaintiff against the defendant in the sum of $284,714.46 including pre-judgment interest;
2. The defendant is to pay the plaintiff's costs on the ordinary basis, unless otherwise ordered;
3. The exhibits are to remain with the court file;
4. Liberty to apply on 7 days' notice if further or other orders are required. Catchwords: DAMAGES – assessment of damages for breach of contract – loss of sale value of stored wine and barrels Legislation Cited: Civil Procedure Act 2005, s 100 Category: Principal judgment Parties: John Colvin (Plaintiff) Rhys Eather (Defendant) Representation: Counsel: Mr GR Graham (Plaintiff) No appearance for defendant
Solicitors: Emery Partners (Plaintiff) No appearance for defendant File Number(s): 2015/352020 Publication restriction: None
Judgment
Nature of case and factual background 1. By statement of claim filed on 30 November 2015, the plaintiff, John Colvin, the proprietor of Montvalley Vineyard, situated at Mt View in the Hunter Valley in NSW, brings these proceedings against the defendant, Rhys Eather, a vigneron trading under the name Rhys Eather Contracting, claiming damages for breach of a contract that the parties had entered into on 20 December 2009. 2. That contract obliged the defendant to provide a safe and secure storage facility for the plaintiff's grapes, grape juice, and wine in the winemaking process. The contract included an obligation on the defendant to properly store, manage and maintain the plaintiff's oak barrels, and to ensure that wine made from the plaintiff's shiraz grapes from the 2010 vintage would be stored in oak barrels for no longer than 20 months before being made into shiraz and rose wines. 3. The plaintiff claims that his 2010 vintage of Shiraz wine was stored in oak barrels for longer than 20 months, and was thereby spoiled and rendered unsuitable for bottling as wine, requiring that it then be sold as vinegar. 4. By the time the plaintiff came to realise the above described problems with his 2010 vintage of shiraz, his 2011 vintage was already in storage with the defendant. Subsequent testing revealed the 2011 vintage had not been protected from oxidisation, and as a result, it was unsuitable for bottling as wine, and it was therefore also sold off as vinegar. 5. The consequence of those events for the plaintiff was that he has lost his entire 2010 and 2011 vintages, and he has needed to destroy the 21 barrels that he had provided to the defendant as those barrels had become irredeemably affected by a known contaminant. 6. The plaintiff claims those losses were incurred as a result of breaches of contract on the part of the defendant, and consequently, the plaintiff claims damages for such breaches. 7. On 4 February 2016, the plaintiff obtained default judgment against the defendant, with unliquidated damages remaining to be assessed. The present hearing therefore concerns the assessment of those damages. 8. Although the defendant has not appeared at the hearing, I am satisfied that the defendant has been notified of the hearing. The assessment of the plaintiff's damages therefore proceeded in the absence of the defendant.
We try to embed the page this law was scraped from. If the site blocks framing, you still get the link and a local excerpt.
Last checked with source on —
Checking whether the official page can be embedded…
Plain-English simplify of this law: a short summary, key points, and both sides of the argument. Generated on first view via Replicate, then cached. Vote on what helps your study.
No study brief is cached for this law yet. Sign up to generate a plain-English brief.
Sign up to generate