NSW Caselaw
Land and Environment Court New South Wales
Medium Neutral Citation: Merrin Developments Pty Ltd v Northern Beaches Council [2016] NSWLEC 1545 Hearing dates: Conciliation conference on 29 June 2016 Date of orders: 17 November 2016 Decision date: 17 November 2016 Jurisdiction: Class 1 Before: Fakes AC Decision: See (4) below Catchwords: DEVELOPMENT APPLICATION; subdivision; multi-dwelling housing; conciliation conference; agreement between the parties; orders Legislation Cited: Land and Environment Court Act 1979 Category: Principal judgment Parties: Merrin Developments Pty Ltd (Applicant) Northern Beaches Council (Respondent) Representation: Applicant: Mr C McFadzean (Solicitor) Respondent: Ms J Reid (Barrister) Ms J Munn (Solicitor)
Solicitors: Applicant: Swaab Attorneys Respondent: King & Wood Mallesons File Number(s): 155984 of 2016 Publication restriction: No
Judgment 1. COMMISSIONER: In this matter, at or after a conciliation conference, an agreement under s 34(3) of the Land and Environment Court Act 1979 (the Court Act) was reached between the parties as to the terms of a decision in the proceedings that was acceptable to the parties. As the presiding Commissioner, I was satisfied that the decision was one that the Court could have made in the proper exercise of its functions (this being the test applied by s 34(3) of the Court Act). As a consequence, s 34(3)(a) of the Act required me to "dispose of the proceedings in accordance with the decision". 2. The Court Act also required me to "set out in writing the terms of the decision" (s 34(3)(b)). The orders made to give effect to the agreement constitute that document. 3. In making the orders to give effect to the agreement between the parties, I was not required to, and have not, made any merit assessment of the issues that were originally in dispute between the parties. 4. The final orders to give effect to the parties' agreement under s34(3) of the Land and Environment Court Act 1979 are: 1. Leave is granted to the Applicant to rely on the following amended plans: Drawing No: Title Author Date DA101 BD Site Plan Intercapital Consultants 17.10.16 DA102 N Elevations " 07.10.16 DA107 B Adaptable floor plans Lots 1-4 and 15-19 " 08.07.16 DA108 E Roof Plan " 28.09.16 DA109 B Floor Plans Lots 12-19 " 08.07.16 DA110 A Individual floor plans Lots 1-8 " 08.07.16 DA111 E Individual floor plans Lots 9-14 " 29.09.16 DA112 B Individual floor plans Lots 15-19 " 30.09.16 DA113 C Indicative Utilities Plan " June 2016 DA115 Lift Shaft details " 19.08.16 INT03-DA 101E Landscape plan Sym Studio 27.07.16 C100 C Site Plan SGC 21.07.16 C200 F General arrangement plan – sheet 1 " 21.07.16 C201 E General arrangement plan – sheet 2 " 21.07.16 C204 C Road longitudinal section – sheet 1 " 21.07.16 C205 D Road longitudinal section – sheet 2 " 21.07.16 C300 D Stormwater Drainage Concept plan – sheet 1 " 27.07.16 C301 E Stormwater Drainage concept plan – sheet 2 " 27.07.16 C302 C Stormwater Drainage concept plan – Details Sheet " 21.07.16 C351 F Road Typical Sections " 21.07.16 C400 C Soil and water management plan " 21.07.16 C401 C Soil and water management plan – Details sheet " 21.07.16 C500 C Creek corridor works – Plan & Long section " 21.07.16 C501 B Creek corridor works – Creek sections " 21.07.16 SW101 B Stormwater concept designs Basement plan " 27.07.16 Sw102 B Stormwater Concept Design Site Plan " 27.07.16
We try to embed the page this law was scraped from. If the site blocks framing, you still get the link and a local excerpt.
Last checked with source on —
Checking whether the official page can be embedded…
Plain-English simplify of this law: a short summary, key points, and both sides of the argument. Generated on first view via Replicate, then cached. Vote on what helps your study.
No study brief is cached for this law yet. Sign up to generate a plain-English brief.
Sign up to generate