Medium Neutral Citation: Bureau SRH Pty Ltd trading as Bureau SRH Architecture v City of Ryde Council [2018] NSWLEC 1345
Hearing dates: Conciliation conference on 28 June 2018
Date of orders: 05 July 2018
Decision date: 05 July 2018
Jurisdiction: Class 1
Before: Blakely AC
Decision: See [4] below
Catchwords: DEVELOPMENT APPLICATION: conciliation conference; agreement between the parties; orders
Legislation Cited: Land and Environment Court Act 1979
Category: Principal judgment
Parties: Bureau SRH Pty Ltd trading as Bureau SRH Architecture (Applicant)
City of Ryde Council (Respondent)
Representation: Solicitors:
M Peatman, Hunt & Hunt Lawyers (Applicant)
P Kapetas, Council of the City of Ryde (Respondent)
File Number(s): 2017/384741
Publication restriction: No
Judgment
1. COMMISSIONER: In this matter, at or after a conciliation conference, an agreement under s 34(3) of the Land and Environment Court Act 1979 (the Court Act) was reached between the parties as to the terms of a decision in the proceedings that was acceptable to the parties. As the presiding Commissioner, I was satisfied that the decision was one that the Court could have made in the proper exercise of its functions (this being the test applied by s 34(3) of the Court Act. As a consequence, s 34(3)(a) of the Act required me to "dispose of the proceedings in accordance with the decision".
2. The Court Act also required me to "set out in writing the terms of the decision" (s 34(3)(b)). The orders made to give effect to the agreement constitute that document.
3. In making the orders to give effect to the agreement between the parties, I was not required to make, and have not made, any merit assessment of the issues that were originally in dispute between the parties.
4. The final orders to give effect to the parties' agreement under s 34(3) of the Land and Environment Court Act 1979 are:
1. The Applicant is granted leave to amend the development application and rely upon the following amended plans, contained at Annexure "A":
# Plan/Report No. Plan/Document Revision for Final Amended DA Submission
Architectural Plans
1. Plan DA 000 Title Page Revision 4 dated 05/04/2018
1. Plan DA 001 Demolition Revision 2 dated 15/08/2017
2. Plan DA 002 Subdivision Revision 2 dated 15/08/2017
3. Plan DA 100 Site Plan/Site Analysis Revision 4 dated 05/04/2018
4. Plan DA 101 Basement Level 03 + 02 Revision 3 dated 05/04/2018
5. Plan DA 102 Basement Level 01 + Ground Floor Revision 6 dated 21/06/2018
6. Plan DA 103 Level 1 + Level 2 Revision 5 dated 06/06/2018
7. Plan DA 104 Level 3 + Level 4 Revision 5 dated 06/06/2018
8. Plan DA 105 Level 5 + Level 6 Revision 6 dated 21/06/2018
9. Plan DA 106 Roof Plan + Post Adaptable Layouts Revision 4 dated 05/04/2018
10. Plan DA 120 Shadow diagram winter solstice Revision 2 dated 21/06/2018
11. Plan DA 121 Shadow diagram spring equinox Revision 2 dated 21/06/2018
12. Plan DA 150 Area calculation/control table Revision 4 dated 21/06/2018
13. Plan DA 200 Streetscape elevations Revision 4 dated 05/04/2018
14. Plan DA 201 Elevations Revision 5 dated 21/06/2018
15. Plan DA 202 Elevations Revision 3 dated 06/06/2018
16. Plan DA 301 Sections Revision 4 dated 05/04/2018
17. Plan DA 401 Views from the Sun Revision 2 dated 21/06/2018
18. Photomontage View from corner of Pope & Smith Street Revision C, dated 06/06/2018
19. Photomontage View from Top Ryde Shopping Centre Revision C, dated 06/06/2018
20. Photomontage View from Smith Street Revision C, dated 06/06/2018
21. Photomontage View from Pope Street Revision C, dated 06/06/2018
22. Photomontage View from Pope Street Revision C, dated 06/06/2018
23. Plan 16218 DA Landscape Plan Revision C dated 16/08/2017
1 of 2 and 2 of 2
Further documents
24. Amended Statement of Environmental Effects prepared by Michael Brewer of Willana Associates April 2018
25. Amended Clause 4.6 Subdivision prepared by Michael Brewer of Willana Associates April 2018
26. Urban Design statement prepared by Rohan Dickson of AE Design Partnership May 2018
Stormwater Plans
27. Drawing No. C00.01 General Notes Issue B, dated 21 December 2016
28. Drawing No. C01.01 Roof Drainage, sediment erosion control plan Issue B, dated 21 December 2016
29. Drawing No. C02.01 Stormwater Drainage Plan Issue B, dated 21 December 2016
30. Drawing No. C03.01 Basement 1 Stormwater Drainage Plan Issue B, dated 21 December 2016
31. Drawing No. C03.02 Basement 2 Stormwater Drainage Plan Issue B, dated 21 December 2016
32. Drawing No. C03.03 Stormwater Details Sheet 1 Issue B, dated 21 December 2016
33. Drawing No. C03.04 Stormwater Details Sheet 2 Issue B, dated 21 December 2016
Survey Plan
34. Survey Plan prepared by Norton Survey Partners 27 May 2016
1. The appeal in respect of Lot 4 DP 5558 and Lot 1 DP 178305, being 2 Smith Street and 10 Pope Street, Ryde, is upheld.
2. Development Application DA-2017/0014 for the for the demolition of the existing building and construction of new premises comprising of residential and commercial tenancies, is approved subject to conditions contained in Annexure "B".
3. The Applicant is pay the Respondent's costs thrown away by reason of the amended plans pursuant to section 8.15(3) of the Environmental Planning and Assessment at 1979 as agreed or assessed.
……………………….
Edward Blakely
Acting Commissioner of the Court
Annexure A (14.4 MB, pdf)
Annexure B (653 KB, pdf)
Amendments
10 July 2018 - Correction to date of orders
DISCLAIMER - Every effort has been made to comply with suppression orders or statutory provisions prohibiting publication that may apply to this judgment or decision. The onus remains on any person using material in the judgment or decision to ensure that the intended use of that material does not breach any such order or provision. Further enquiries may be directed to the Registry of the Court or Tribunal in which it was generated.
Decision last updated: 10 July 2018