Medium Neutral Citation: HBU Projects No 2 Pty Ltd v Lake Macquarie City Council [2018] NSWLEC 1450 Hearing dates: Conciliation conference on 7, 14 and 28 June 2018; 30 July 2018 Date of orders: 21 August 2018 Decision date: 21 August 2018 Jurisdiction: Class 1 Before: Dickson C Decision: See [5] below Catchwords: DEVELOPMENT APPLICATION: conciliation conference; agreement between the parties; orders Legislation Cited: Environmental Planning and Assessment Act 1979 Land and Environment Court Act 1979 Category: Principal judgment Parties: HBU Projects No 2 Pty Ltd (Applicant) Lake Macquarie City Council (Respondent) Representation: Solicitors: G Long, Long Legal (Applicant) S Lucy, Lake Macquarie City Council (Respondent) File Number(s): 2018/75929 Publication restriction: No
Judgment 1. COMMISSIONER: This is an appeal by HBU Projects No 2 Pty Ltd against the actual refusal by Lake Macquarie City Council of DA/1582/2017 for proposed multi-dwelling housing at 37 Wilsons Road, Mount Hutton (Lot 103 DP 1076796). 2. In this matter, at or after a conciliation conference, an agreement under s 34(3) of the Land and Environment Court Act 1979 (the Court Act) was reached between the parties as to the terms of a decision in the proceedings that was acceptable to the parties. As the presiding Commissioner, I was satisfied that the decision was one that the Court could have made in the proper exercise of its functions (this being the test applied by s 34(3) of the Court Act. As a consequence, s 34(3)(a) of the Act required me to "dispose of the proceedings in accordance with the decision". 3. The Court Act also required me to "set out in writing the terms of the decision" (s 34(3)(b)). The orders made to give effect to the agreement constitute that document. 4. In making the orders to give effect to the agreement between the parties, I was not required to make, and have not made, any merit assessment of the issues that were originally in dispute between the parties. 5. The final orders to give effect to the parties' agreement under s 34(3) of the Land and Environment Court Act 1979 are: 1. The Applicant be granted leave to rely upon the following amended plans: Plan Drawing Revision Date 1.1 Architectural Plans 2.08.2018 (a) Cover sheet DA-001 J (b) Roof Analysis Plan DA-001 J (c) Lot Plan DA-100 J (d) Ground Floor Site Plan DA-101 J (e) First Floor Site Plan DA-102 J (f) Elevations DA-201 J DA-202 J DA-203 J (g) Unit 01-03 Plans DA-104 J (h) Unit 01-03 Elevations DA-402 J (i) Unit 01-03 Section DA-402 J (j) Unit 04-03 Plans DA-404 J (k) Unit 04-06 Elevations DA-405 J (l) Unit 04-06 Sections DA-406 J (m) Unit 07 Plans DA-407 J (n) Unit 07 Elevations and Section DA-408 J (o) Sun Diagrams DA-500 J (p) Materials Selection DA-501 J DA-502 J 1.2 Landscape Plans 8.08.2018 (a) Cover Sheet L000 K (b) Landscape Plan L301 K (c) Landscape Details L401 G (d) Indicative Plant Schedule L501 H 1.3 (a) Sedimentation and Erosion Control Plan C01 8 7.08.2018 (b) Sedimentation and Erosion Control Details C02 5 1.4 (a) Stormwater Plan C03 8 7.08.2018 (b) Stormwater Details C04 5 1.5 (a) Turning Path Entry Plan Sheet 1 T01 3 7.08.2018 (b) Turning Path Entry Plan Sheet 2 T02 3 (c) Turning Path Entry Plan Sheet 3 T03 3 (d) Turning Path Exit Plan Sheet 1 T04 3 (e) Turning Path Exit Plan Sheet 2 T05 3 (f) Turning Path Exit Plan Sheet 3 T06 3
We try to embed the page this law was scraped from. If the site blocks framing, you still get the link and a local excerpt.
Last checked with source on —
Checking whether the official page can be embedded…
Plain-English simplify of this law: a short summary, key points, and both sides of the argument. Generated on first view via Replicate, then cached. Vote on what helps your study.
No study brief is cached for this law yet. Sign up to generate a plain-English brief.
Sign up to generate