Queensland Legislation
Water Plan (Burdekin Basin) 2007
Part 1 Preliminary
1 Short title This water plan may be cited as the Water Plan (Burdekin Basin) 2007.
2 Purposes of plan The following are the purposes of this plan— (a) to define the availability of water in the plan area; (b) to provide a framework for sustainably managing water and the taking of water; (c) to identify priorities and mechanisms for dealing with future water requirements; (d) to provide a framework for establishing water allocations; (e) to provide a framework for reversing, where practicable, degradation that has occurred in natural ecosystems; (f) to regulate the taking of overland flow water.
3 Definitions The dictionary in schedule 10 defines particular words used in this plan.
3A Meaning of existing overland flow works (1) Works to take overland flow water are existing overland flow works if the works— (a) were in existence on 17 January 2002; or (b) were started, but not completed, by 17 January 2002 and either— (i) if section 26 moratorium notice that applied for the works was varied under repealed section 27 of the Act—have been, or are being, completed in accordance with the varied moratorium notice; or (ii) if subparagraph (i) does not apply—were completed by 30 June 2002; or (c) are works, started before 3 August 2007, to which the section 42 moratorium notice did not apply. (2) Also, works that are a reconfiguration of works mentioned in subsection (1) (reconfigured works) are existing overland flow works if the reconfiguration does not increase the average annual volume of water taken using the works before their reconfiguration. (3) In this section— average annual volume, of overland flow water taken using reconfigured works, is the average volume of the water taken in a year using the works during the period— (a) starting on the later of the following days (the start date)— (i) the day the water was first taken using the works before the works were reconfigured; (ii) 3 August 1997; and (b) ending on the anniversary of the start date that immediately preceded the day overland flow water was first taken after the works were reconfigured. repealed, for a section of the Act, means the section as in force from time to time before 6 December 2016. section 26 moratorium notice means a moratorium notice published under repealed section 26 of the Act. section 42 moratorium notice means the moratorium notice— (a) published on 17 January 2002 under section 42 of the Act as that section was in force on that day; and (b) as amended on 25 July 2002.
We try to embed the page this law was scraped from. If the site blocks framing, you still get the link and a local excerpt.
Last checked with source on —
Checking whether the official page can be embedded…
Plain-English simplify of this law: a short summary, key points, and both sides of the argument. Generated on first view via Replicate, then cached. Vote on what helps your study.
No study brief is cached for this law yet. Sign up to generate a plain-English brief.
Sign up to generate