Gas Industry (Planning Permit Exemption) Regulations 2024
I, the Governor in and over the State of Tasmania and its Dependencies in the Commonwealth of Australia, acting with the advice of the Executive Council, make the following regulations under the Gas Industry Act 2019 .
20 June 2024
B. BAKER
Governor
By Her Excellency's Command,
NICK DUIGAN
Minister for Energy and Renewables
1. Short title These regulations may be cited as the Gas Industry (Planning Permit Exemption) Regulations 2024 .
2. Commencement These regulations take effect on the day on which their making is notified in the Gazette.
3. Interpretation In these regulations – Act means the Gas Industry Act 2019 ; pressure reduction facility means a facility that has the primary purpose of altering the pressure between a transmission pipeline and a distribution system.
4. Prescribed work and criteria (1) For the purposes of section 60(2)(b) of the Act, work is of a prescribed kind if the work is – (a) gas connection work; or (b) work undertaken on gas infrastructure; or (c) work undertaken on a pressure reduction facility. (2) For the purposes of section 60(2)(b) of the Act, the prescribed criteria for work prescribed under subregulation (1) are – (a) in the case of work prescribed under subregulation (1)(a) , that the work is undertaken on a distribution system; and (b) in the case of work prescribed under subregulation (1)(b) , that the work is not undertaken on a pressure reduction facility; and (c) in the case of work prescribed under subregulation (1)(c) , that – (i) the work is only undertaken within an area that is zoned, in a planning scheme under the Land Use Planning and Approvals Act 1993 , for rural or industrial purposes; and (ii) the work is intended to be undertaken primarily during daylight hours; and (iii) if the work is intended to take more than 4 weeks, and it is intended, at the time the work commences, that the work will not result in a time average A-weighted sound pressure level (as defined in Australian Standards AS 1055:2018 Acoustics – Description and measurement of environmental noise) that exceeds – (A) if the work is to take not more than 26 weeks to be completed, 60dB(A) when evaluated over any 10-minute period beyond the boundary of the land parcel on which the pressure reduction facility is situated; and (B) if the work is to take more than 26 weeks to be completed, 55dB(A) when evaluated over any 10-minute period beyond the boundary of the land parcel on which the pressure reduction facility is situated; and (iv) at the time the work commences it is not intended that the site, where the work is being undertaken, will be required to be artificially illuminated for substantial periods between dusk and dawn, unless necessary during an emergency or emergency work; and (v) at the time the work is completed, the pressure reduction facility is not intended to exceed – (A) 7.5 metres in height at any point; and (B) a ground area of more than 30 metres by 40 metres.
We try to embed the page this law was scraped from. If the site blocks framing, you still get the link and a local excerpt.
Last checked with source on —
Checking whether the official page can be embedded…
Plain-English simplify of this law: a short summary, key points, and both sides of the argument. Generated on first view via Replicate, then cached. Vote on what helps your study.
No study brief is cached for this law yet. Sign up to generate a plain-English brief.
Sign up to generate