Select any passage to save a personal note with optional tags.
COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY
SCHEDULE OF AIRWORTHINESS DIRECTIVES
Grumman G21 (Goose) Series Aeroplanes
AD/G21/4 Rudder Control Push-Rod Assembly P/N 12727-1 - Inspection
10/77
Applicability: All models.
Requirement: 1. Remove rudder control push rod assembly P/N 12727-1.
2. Thoroughly clean both rod end fittings.
3. Inspect both fittings for cracks using a dye penetrant technique in conjunction with at least a 10X magnifying glass.
Note 1. Push rod assembly P/N 12727-1 is connected to the LH rudder pedals and is located below the pilot's compartment floor approximately 240 mm to the right of the aircraft centre line.
Note 2. FAA AD 63-27-2 Amendment 655 refers.
Compliance: Inspect initially before issue of Certificate of Airworthiness and thereafter at intervals not exceeding 100 hours time in service.